PRODUCTIONPRODUCTION IN MANUFACTURING UNIT

As per Organization, Production of a Set of Machines was 62.5 % despite running round the clock .

Resulting in Higher Manpower Cost, Energy Cost etc. Delayed Delivery

CHALLENGESCHALLENGES

SOLUTIONSOLUTION AND IMPACT

  • GHMC Private Limited developed a Process of production, which was modified from the previous process.

  • For the Solution, a lot of data gathering was done on daily basis.

  • New Process is better organised and more efficient.

  • Production capacity was brought to 90% as planned.

  • Dispatch reached to normal level with better Quality.

  • Production of few products were blacklisted.